首页 社会正文

皇冠管理端(www.99cx.vip):GCAP completes 309.28 KWp solar PV systems

admin 社会 2022-08-26 04:39:08 5 0

欧博allbet网址www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

G Capital Bhd executive director Datuk Yap Yee Ping

KUALA LUMPUR: G Capital Bhd’s (GCAP) 70%-owned subsidiary, Solarcity Malaysia Sdn Bhd has completed the installation and commenced operation of a 309.28 KWp Solar Photovoltaic electric power generation system (Solar PV System).

The solar PV is for the supplemental power purchase agreement (PPA) with Muda Paper Converting Sdn Bhd, a wholly-owned subsidiary of Muda Holdings Bhd inked on May 30.

,

皇冠管理端www.99cx.vip)实时更新发布最新最快最有效的皇冠管理端网址,包括皇冠管理端手机网址,皇冠管理端备用网址,皇冠管理端最新网址,皇冠管理端足球网址,皇冠管理端网址大全。

,

"I’m pleased to witness the completion and commissioning of 309.28 KWp add-on to Muda Paper Converting. All these small yet crucial delivery of promises will help Malaysia in reaching the target set in Renewable Energy Transition Roadmap 2035,” executive director Datuk Yap Yee Ping said in a statement.

The plant will be contributing revenue and earnings to GCAP over a span of 25 years from Aug 19, 2022, the commercial operation date.

“With the completion of the 309.28 KWp solar PV systems in Simpang Ampat, this brings our total installed solar PV systems capacity to 15.6MWp inception-to-date,” Yap said.


转载说明:本文转载自Sunbet。
版权声明

本文仅代表作者观点,不代表本站立场。
本文系作者授权发表,未经许可,不得转载。

发表评论

评论列表(0人评论 , 5人围观)
☹还没有评论,来说两句吧...

热门标签

    此处不必修改,程序自动调用!